Pedestal crane lifting chart

broken image
broken image

Typically crawler cranes require an adequately level supporting ground over a large area (slope of 0 to 0.3 degrees), which leads to extensive ground preparation prior to the lift. The PC 3800-1 can significantly reduce the amount of time needed to prepare a jobsite for crane operation. It helps reduce ground preparation and is easy to transport. The PC 3800-1 boasts strong load charts, especially with main boom-only configurations. The new Demag PC 3800-1 pedestal crane provides access to jobsites previously unreachable with a standard crawler crane model. Demag PC 3800-1 pedestal crane is easier to setup and transport than a traditional crawler crane.

broken image